Abstract:Top Well and BJ SERVICES teamed up to provide assistance to a customer after a casing fracture treatment had sanded off leaving over 800 meters of sand inside the well.
Abstract:In 2014, Top Well was contracted to provide snubbing services on three wells in Sichuan for EOG. The jobs involved pulling out 60.3mm testing strings
Abstract:Petro China contacted Top Well regarding their options to permanently abandon a well that had been suspended with a 45 meter (150’) cement plug just 50 meters (165’) from surfac
Abstract:Top Well was contacted by Burlington Resources regarding isolating the wellhead of a recently fractured well. After the fracture treatment, there were found to be two problems with